Sunday 29 July 2012

A week on the project,

Glazed, ceilinged, floored, connected and the oil feed pipe laid.
It is now a room -- (with a view).
Had to hang on till Monday for delivery of 'french doors'
and a meeting with a heating engineer.
Looks like we might be warm this winter.
 A bit premature, but we have the dining table in its place.
We cut the widest possible opening for the french doors. (dirty job)
( Look NO door)
Wind and watertight now so this is just the connection between the
original house and the extension.
Hope to see you all on Wednesday